Why Most People Can’t Do 10x

4 minute read

Published:

A ten-year detour beside a direct shortcut

Author: Koutian Wu; GitHub: ktwu01

Most people cannot do 10x because they ask the wrong question.

They ask how to make a ten-month project a little faster. The answer is always to work late, push harder, and give up the weekends. Ten months becomes eight. Everyone is exhausted, but the road is still the same road.

The most widely repeated Silicon Valley advice goes something like this: stop waiting patiently and ask yourself how you could complete your ten-year plan in six months. You will probably fail, but you will be far ahead of the person who simply accepted that the plan had to take ten years. The quote is usually attributed to Elon Musk, but it actually came from Peter Thiel, Musk’s PayPal co-founder. Thiel’s original point was even sharper: sometimes you really do have to walk the ten-year road, but you should at least ask whether those ten years are a law of the world or a story you invented for yourself.

Why are ordinary people afraid even to ask?

Because a ten-year plan contains a feeling of safety. If you move slowly, you do not have to face failure today, admit that your current path might be wrong, offend anyone, or cut anything away. The farther you push the deadline, the farther you push responsibility. If you have not succeeded ten years from now, the environment was bad or the timing was wrong. At least it was not that you were incapable today.

Musk often invokes Parkinson’s law: work expands to fill the time you give it. Give a task ten months and it grows into a ten-month task, filled with meetings, waiting for replies, spare time, and layers of compromise. Give it ten days and it becomes honest. What remains are the real problems.

At the end of 2022, when Musk moved Twitter’s servers, his team estimated that it would take six to nine months—the industry standard, written into a report that nobody could criticize. He ordered them to finish within weeks. Engineers said it was physically impossible. He flew to a data center, rented trucks, and helped load the racks. Within days, the nine-month project had started moving.

When I first heard that story, I paused. Admiration for his ruthlessness was only part of it. More surprising was the realization that the six-to-nine-month estimate had never been a physical fact. It was a schedule assembled from everyone’s default assumptions.

That is the real dividing line. Cutting ten months to eight means your brain is still using the original map and looking for a shortcut. Cutting ten months to ten days makes the map useless. You are forced to admit that the old method cannot work, and only then do you ask which steps do not need to exist, which people you do not need to wait for, and which rules everyone follows out of habit even though nobody checks them.

What traps ordinary people is precisely the fear of making the map useless.

They would rather spend ten years on a certain, slow road than admit that the road itself might be wrong. Admitting that the road is wrong hurts more than moving slowly. At least slow progress still feels like progress. If the road is wrong, everything already spent on it is lost.

There is another layer: 10x truly consumes attention. Most people spend their attention at the execution layer—today’s meeting, tomorrow’s spreadsheet, the harmless deadline after that. Only three things can produce 10x: money, relationships, and creative thinking. Money determines how many resources you can mobilize. Relationships determine whose shoulders you can stand on. Creative thinking determines whether you can imagine a road that is not on the map. Work harder on everything else and you are still turning inside the same multiplier.

Musk also has a rougher formula: work one hundred hours a week while others work forty, and a year’s work for them takes four months for you. That is compression through physical effort. Most people cannot—or need not—copy it. Thiel’s question works at the level of thinking, and anyone can ask it. The difference is whether you really throw away the old plan after you hear the answer.

So most people cannot do 10x not because they are stupid, and not because they do not work hard. Many people work unbelievably hard. They simply have never seriously asked themselves: if this had to be finished in six months, what would I do today that is completely different from what I am doing now?

Few people can ask that question. Fewer still dare to act on the answer.